You want a beautiful kitchen. But how long does it take to make custom kitchen cabinets? Let’s dive in to the process – from design to installation. You’ll have a better idea of how long it will be until you have your dream kitchen.
How long does it take to make custom kitchen cabinets?
The average lead time to make custom kitchen cabinets is between 6-12 weeks. This varies depending on the company and their processes, as well as current economic conditions and material availability.
But 6-12 Weeks Won't Get You a New Kitchen
6-12 weeks includes how long it takes to make the cabinets and have them shipped for install. There’s a whole lot more involved with planning an entire kitchen renovation from start to finish.
Your kitchen renovation timeline
A kitchen renovation timeline includes the time it takes to plan the kitchen, the time it takes for a designer to create it, the time it takes for the kitchen to be made, and finally, the installation.
This may seem like a long time, but most homeowners don’t rush into a significant investment in their home. That is what a kitchen is, after all. The average kitchen takes 11 months from idea to completion.
Here’s a timeline of how long your renovation will take.
3 Months
The first three months includes the dreaming and planning process.
- You get started with your kitchen renovation, including deciding your style and budget.
- You visit some designer showrooms and kitchen outfitters.
- You get a quote and sign a contract with your preferred design center.
This is when your order is sent to our facility to be manufactured.
6-12 Weeks
With custom cabinets, each kitchen is made to order for maximum customization. Cool right? This is when the 6-12 week lead time starts, the time it takes to make custom kitchen cabinets. Here’s what happens during this time:
- Installers are contacted.
- Product designer uploads material list.
- Shipping and other logistics are organized.
- Orders are sent to production to start working on the cabinets.
- Assembly and packaging of the cabinets.
- Cabinets are shipped!
The Cabinets Arrive
Once your cabinets arrive onsite, you and your designer should open the boxes and check the quality. Then depending when your installation was scheduled, your kitchen will be put together and hopefully ready to use soon! Perfect timing.
Enjoy your new custom kitchen!
Once you have your new kitchen it’s time to enjoy it! We hope this short guide helps you understand how long it takes to make custom kitchen cabinets.